After 20 years, the EEG remuneration ends. What options do plant operators have? Continued operation, PPA, repowering and self-consumption at a glance.

What Does Post-EEG Mean?

The German Renewable Energy Sources Act (EEG) guarantees operators of wind and solar plants a fixed feed-in tariff for 20 years from commissioning. After that, the subsidy ends – the plant is then in what is known as post-EEG operation.

The first big wave affected wind turbines from 2021 onward: thousands of turbines that went into operation around the turn of the millennium lost their remuneration. In the coming years, photovoltaic systems will increasingly follow.

In many cases, the plants are still fully functional from a technical point of view – but without guaranteed remuneration they need a new revenue model. Operators face a key question: shutdown, continued operation or repowering?

Option 1: Continued Operation with Direct Marketing

With continued operation, the electricity generated is sold via a direct marketer on the spot market (day-ahead and intraday). Revenues depend directly on current market prices – there is no longer any fixed remuneration.

Since many post-EEG plants are already fully depreciated, even moderate market prices can be economically sufficient. The quality of the generation forecasts is decisive for success.

Requirements for direct marketing:

  • Precise real-time metering technology for reliable feed-in forecasts
  • Registration in the direct marketer's virtual power plant
  • Remote controllability of the plant in accordance with EEG requirements

acteno delivers 15-minute interval data via API and MSCONS – the ideal data basis for the direct marketer's precise forecasts and schedule notifications.

Option 2: Power Purchase Agreement (PPA)

A power purchase agreement (PPA) is a long-term electricity supply contract between a producer and a buyer. The electricity is sold at a fixed agreed price over a defined term – typically between 1 and 10 years.

PPAs offer revenue certainty and enable long-term profitability planning – particularly attractive for post-EEG plants.

Physical PPA

  • Actual delivery of electricity to the buyer
  • Direct physical connection or via the grid
  • Guarantees of origin included

Virtual PPA

  • Purely financial hedge (contract for difference)
  • No physical delivery required
  • Can be flexibly combined with other marketing models

For PPAs, metering the PPA volumes separately from other forms of marketing is mandatory. acteno ensures separate metering for each marketing model – technically sound and compliant with market communication requirements.

Option 3: Repowering

In repowering, old plants are replaced by modern, more powerful turbines or modules. This allows a significantly higher yield to be achieved at the same site – often with fewer units.

Repowering requires a completely new metering concept tailored to the new plant configuration. acteno handles the entire metering technology process on a turnkey basis:

1

Planning

Creation of the individual metering concept for the new plant configuration – tailored to the marketing model and grid connection.

2

Grid Operator Coordination

Coordination with the responsible grid operator on connection rules, meter positions and instrument transformer sizing.

3

Installation

Professional installation and commissioning of all metering technology by our own technicians.

4

Commissioning & Operation

Market communication, data provision and ongoing operation – all from a single source.

The Role of Metering Technology in Post-EEG

In post-EEG operation, metering technology becomes an economic success factor. Without precise and timely metering data, forecasts cannot be produced and marketing models cannot be billed correctly.

Specifically, professional metering technology is decisive for:

Separate Metering by Form of Marketing

Separate recording of PPA volumes, direct marketing volumes and self-consumption – cleanly separated for correct billing and balancing.

Real-Time Data for Forecasting and Trading

15-minute interval data in real time via API and MSCONS – the basis for precise feed-in forecasts and optimal marketing on the spot market.

Redispatch 2.0 Compliance

Compliance with all regulatory requirements for data delivery and remote controllability in accordance with the current Redispatch 2.0 rules.

Performance Monitoring and Yield Optimization

Continuous monitoring of plant performance for early detection of yield losses and targeted optimization.

As an independent metering operator, acteno energy specializes in exactly these requirements – throughout Germany, at all voltage levels, with open interfaces and full data transparency.

Self-Consumption as an Additional Option

A particularly attractive option for post-EEG plants is self-consumption: the electricity generated is consumed directly on site instead of being fed into the grid. The advantage: no grid fees are incurred for the self-consumed electricity.

In practice, a surplus feed-in model is often implemented: the electricity is primarily self-consumed, while surplus volumes are fed into the grid and marketed. This model requires a complex metering concept that cleanly separates self-consumption and feed-in.

acteno develops individual metering concepts for self-consumption models – from design and coordination with the grid operator through to implementation and ongoing operation.

Frequently Asked Questions About Post-EEG

What happens when the EEG subsidy expires?+
After 20 years, the guaranteed EEG feed-in tariff ends. The plant may continue to operate, but it no longer receives a fixed remuneration. Operators have to choose a new marketing model – for example direct marketing on the spot market, a power purchase agreement (PPA) or self-consumption optimization. Without a new model, they face uneconomical feed-in at market value minus marketing costs.
Is it worth continuing to operate an old wind turbine?+
In many cases, yes. Old wind turbines are often fully depreciated, so running costs are low. The decisive factors are the technical condition of the plant, the quality of the site and the achievable electricity price level. With professional direct marketing and precise metering technology for optimal forecasts, post-EEG plants can also be operated profitably.
What is a PPA and how does it work?+
A power purchase agreement (PPA) is a long-term electricity supply contract between a producer and a buyer. The producer supplies electricity at a fixed price over a defined term (typically 1–10 years). There are physical PPAs (actual delivery of electricity) and virtual PPAs (financial hedging). PPAs offer planning certainty for both parties and enable the economically viable continued operation of post-EEG plants.
What role does the metering operator play after the EEG?+
The metering operator is crucial in post-EEG operation: it delivers precise real-time metering data for forecasts and schedules in direct marketing, ensures the separate metering of different forms of marketing (PPA, direct marketing, self-consumption) and guarantees Redispatch 2.0 compliance. An independent metering operator (MSB) such as acteno offers full data transparency and open interfaces in the process.